AGRICULTURE SECTOR

No. Project Title Project Summary Availability of Feasibility Study Estimated Investment (US$) Contracting Authority and/ or Promoter Project Requirements/ Financing Mode
1 Farm Block Development Programme The Government of the Republic of Zambia identified Agriculture as the Engine to Economic development as well as the Main stay of the Economy. In 2002 GRZ embarked on development and commercialization of agriculture land as the Farm Block Development Programme (FBDP). This programme entailed availing land for large scale agribusiness investment for the private sector. One Farm Block was targeted for development in each Province. The total catchment area for each Farm Block is 100, 000 hectares. Each Farm Block is designed to have four categories of farms, namely: Small Scale, Medium, Commercial and a Core/ anchor farmer. Zambia has ten (10) provinces and in each province there is a farm block. In progress To be determined by the feasibility study Ministry of Agriculture Open for Investment
2 Livestock Breeding Centers The project is for the establishment of livestock breeding and artificial insemination centers across the country. This will involve the breeding of animals such as cattle, sheep and goats among others. Access roads, electricity and airport are available in ideal areas of Chipata and Katete Districts of Eastern Province. The project is still at concept stage. In progress To be determined by the feasibility study Ministry of Agriculture PPP
3 Aquaculture Development The project is for the establishment of cage fish farming ventures on the Lakes Meru and Bangweulu. 5 sites have been identified and Environmental Project Briefs have been conducted along the shores of Lake Mweru which are not more than 2 kilometers from the main road and power supply lines. Land for processing and storage facilities has been reserved. In progress To be determined by the feasibility study Ministry of Fisheries and Livestock/ Ministry of Local Government Open for Investment

TOURISM SECTOR

No. Project Title Project Summary Availability of Feasibility Study Estimated Investment (US$) Contracting Authority and/ or Promoter Project Requirements/ Financing Mode
1 Mulungushi International conference center redevelopment Redevelopment of the existing Mulungushi International Centre (MICC) in Lusaka into an Ultra-modern International Conferencing facility. Infrastructure or works required: refurbishing the existing infrastructure, developing a 5000 capacity Auditorium, Exhibition Centre, Business Park and Office Block, a five (5) star hotel and three (3) Star hotel, multi-Storey Car Park and nature park Available US$400 million MICC Limited/ Industrial Development Corporation (IDC) Equity and/ or debt Financing
2 Long Acres Lodge Redevelopment Redevelopment of the Long Acres Lodge into ultra – modern commercial facilities such as a 5 – Star hotel, shopping mall, office park among others In progress To be determined by the feasibility study PPP- Preferably DFBOT
3 Lake Mweru Tourism Corridor Development The project is for the development of tourism facilities on the shores of Lake Mweru, Peninsula and Islands (Kilwa Carves) coupled with sport fishing, boat cruises, visits to historical and cultural sites among others. To be determined by the feasibility study Ministry of Tourism and Arts Open for Investment

CONSTRUCTION SECTOR

No. Project Title Project Summary Availability of Feasibility Study Estimated Investment (US$) Contracting Authority and/ or Promoter Project Requirements/ Financing Mode
1 Redevelopment of the Zambia International trade Fair Grounds and Mukuba hotel Redevelopment of the 60 hectares of land into a world class conferencing and exhibition facility as well as the expansion, redevelopment and modernization of existing Mukuba hotel into a five star hotel facility. In progress To be determined by the feasibility study Zambia International Trade Fair PPP- Preferably DFBOT
2 Lusaka south Multi Facility Economic Zone Development of a 2,100 Hectare multi-facility economic zone in Lusaka. Government is seeking potential partners to provide financing, develop and manage the proposed zone. The zone will provide high class infrastructure and target both export and domestically oriented business to Zambia. Master Plan available US$1 billion LS-MFEZ Limited Equity Financing-Master plan completed-Road infrastructure development on-going.
3 UNZA Student Hostels Development of student hostels and staff housing at the University of Zambia (UNZA) on the university along Great East road. The University enrolls about 20,000 students against bed space accommodation 8,000. A feasibility study is currently being undertaken In progress To be determined by the feasibility study University of Zambia PPP- Preferably DFBOT
4 ZNBS mixed-use real estate development project Development of mixed use real estate complexes comprising of commercial and business hubs with residential units and quality tourism and leisure facilities on parcels of land that the Zambia National Building Society (ZNBS) owns in Chilanga and Nyimba Districts. Feasibility study currently being undertaken. In progress To be determined by the feasibility study Zambia National Building Society PPP- Preferably DFBOT
5 Jubilee City Development of a mixed use real estate on a 16 hectare extreme prime land, in Lusaka, currently housing Government offices. The project will involve the redevelopment of the existing offices into an up – market mixed use complex to comprise offices, hotels, shopping facilities, among others. In progress To be determined by the feasibility study Ministry of Works and Supply/ Ministry of Housing and Infrastructure Development. PPP- Preferably DFBOT
6 Kafue Steel Industrial Park/ MFEZ The project is for the establishment of an Industrial Park or Multi-Facility Economic Zone for steel production in Kafue District of Lusaka Province In progress To be determined by the feasibility study Ministry of Commerce Trade and Industry Open for Investment
7 Development of an Industrial Park/ MFEZ The project is for the establishment of an Industrial Park/ Multi Facility Economic Zone pre-dominantly for agro-processing of items such as fruits, crops, fish and production of fish and animal feed among others. Land to the extent of 1,800 hectares has been reserved in Nchelenge District of Luapula Province In progress To be determined by the feasibility study Luapula Provincial Administartion/ Ministry of Commerce Trade and Industry Open for Investment (preferably PPP)
8 Construction of Decent and Affordable Housing Units Zambia has deficit of over 2.5 million decent and affordable housing unit. The Zambia Government is soliciting for partners to develop the housing units. In progress To be determined by the feasibility study Ministry Housing and Infrastructure Devlopment PPP

TRANSPORT SECTOR

No. Project Title Project Summary Availability of Feasibility Study Estimated Investment (US$) Contracting Authority and/ or Promoter Project Requirements/ Financing Mode
1 Expansion of the Mansa Airport Expansion of the Mansa Airport into an International Airport which will form another entry point into the country. This could aid in exploiting the numerous tourist attractions in the Northern part of the country. In progress To be determined by the feasibility study Ministry of Transport and Communication/ Aviation Department PPP
2 District & Provincial Aerodromesproject Construction and upgrading of district and provincial aerodromes, nationwide, including erection of toll gates. In progress To be determined by the feasibility study (Traffic count study) Ministry of Works and Supply PPP and/ or Contract Financing
3 Lusaka Mass transit railway Development of a modern urban metro mass transit railway line to cater for the growing population in Lusaka and as a way of reducing traffic congestion in Lusaka and surrounding areas. he project is at conceptual stage. In progress To be determined by the feasibility study Ministry of Transport and Communication Feasibility study required. Open for investment
4 Kafue (Zambia) – Ziwa (Zimbabwe) Railway Linking the Zambia Railway line from Kafue (Zambia) to Ziwa (Zimbabwe) (341km) the way to the Beira Port as the shortest route to the port of Baira in Mozambique. In progress To be determined by the feasibility study Ministry of Transport and Communication Equity and/ or Debt financing
5 TAZARA – Petauke – Mchinji/Chipata Railway Extension of the existing railway line to TAZARA by 406km. The railway line involves linking the Chipata–Mchinji line through Petauke District to the port of Nacala in Mozambique. In progress To be determined by the feasibility study Ministry of Transport and Communication Equity and/ or Debt financing
6 Nseluka – Mpulungu Railway This will involve the development of approximately 190 kilometre stretch of railway line from Mpulungu to Nseluka (within the Northern Province of Zambia) connecting to the TAZARA. This will provided easy transport to three Districts of the ten in Northern Province i.e. Mungwi, Mbala and Mpulungu Districts. Feasibility study not yet concluded To be determined by the feasibility study Ministry of Transport and Communication Open for Investment
7 Livingstone – Kazungula – Sesheke Railway This will involve the development of approximately 193 kilometre stretch of railway line from Livingstone District, Southern Province, (which will run parallel to the border with Zimbabwe, Botswana and Namibia) to Sesheke District, Western Province, and will connect to the existing Zambia Railways Limited Railway line in Livingstone which in turn connects to TAZARA in Kapiri Mposhi, Central Province. Feasibility study not yet concluded To be determined by the feasibility study Ministry of Transport and Communication Open for Investment
8 Luano Railway Line Establishment of a Railway line in Luano district that will cover a distance of 650KM from Kasama to the Border with the Democratic Republic of Congo (DRC). It will connect to the railway line in the DRC which runs up to Katanga province. Pre-feasibility available S$3.2 million Ministry of Transport (Luano Railways Zambia Limited) Open for investment (preferably PPP)

ENERGY SECTOR

No. Project Title Project Summary Availability of Feasibility Study Estimated Investment (US$) Contracting Authority and/ or Promoter Project Requirements/ Financing Mode
1 Kabwelume Water Falls Hydro Power Station Kabwelume Water Falls hydro power station site is located along the kalungwishi River in Kawambwa district of Luapula Province and has power generation potential of up to 96 Megga Watts In progress To be determined by the feasibility study Ministry of Energy/ OPPPI PPP
2 Lumangwe Water Falls Hydro Power Station Lumangwe Water Falls hydro power station site is located along the Kalungwishi River and has power generation potential of up to 86 Megga Watts In progress To be determined by the feasibility study (Traffic count study) Ministry of Energy/ OPPPI PPP
3 Expansion of Mpanta Solar Mini Grid The project is for the expansion of the Mpanta Solar mini grid which is located in Mpanta area of Samfya district of Luapula Province. This will curb the high demand for electricity. In progress To be determined by the feasibility study Ministry of Energy/ Rural Electrification Authority PPP
4 Mwansa-bombwe Solar Power Plant Establishment of a solar power plant on a 4 hectares of land to supply power to 100 housing units and other upcoming infrastructure facilities In progress To be determined by the feasibility study Ministry of Energy/ Ministry of Local Government (Mwansa-bombwe District Council) PPP
5 Mambilima Falls site 1 Hydro Power Station Mambilima Falls site 1 hydro power station which is located along the Luapula River and has a power generation potential of 124 Megga Watts In progress To be determined by the feasibility study Ministry of Energy/ OPPPI PPP
6 Mambilima Falls site 2 Hydro Power Station Mambilima Falls site 1 hydro power station which is located along the Luapula River and has a power generation potential of 190 Megga Watts In progress To be determined by the feasibility study Ministry of Energy/ OPPPI PPP
7 Mumbotuta Falls site 1 Hydro Power Station Mumbotuta Falls site 1 hydro power station which is located along the Luapula River and has a power generation potential of 190 Megga Watts In progress To be determined by the feasibility study Ministry of Energy/ OPPPI PPP
8 Mumbotuta Falls site 2 Hydro Power Station Mumbotuta Falls site 2 hydro power station which is located along the Luapula River and has a power generation potential of 300 Megga Watts In progress To be determined by the feasibility study Ministry of Energy/ OPPPI PPP
8 Kundabwika Falls Hydro Power Station Kundabwika hydro power station which is located along the Kalungwishi River and has a power generation potential of 151 Megga Watts In progress To be determined by the feasibility study Ministry of Energy/ OPPPI PPP

MINING SECTOR

No. Project Title Project Summary Availability of Feasibility Study Estimated Investment (US$) Contracting Authority and/ or Promoter Project Requirements/ Financing Mode
1 Mushima and Chimpakita mines The project is for the establishment of Copper mines in Mushima and Chimpakita areas of Chienge District In progress To be determined by the feasibility study Ministry of Mines/ Ministry of Local Government (Chienge Town Council) Open for Investment
2 Quarry Mine The Samfya District Council has identified 3 sites for quarry mining aimed at responding to the increased demand for quarry due to massive infrastructure development that is being undertaken in the district. To be determined by the feasibility study Ministry of Mines/ Ministry of Local Government (Samfya District Council) Open for Investment
3 Manganese Ore Mine The project is for revamping of Chilamundo, Mubende, Chibwempulyu and Chilengwa Manganese Ore mines. Nkonge and Nalupembe Manganese Ore mines where explorations have already been conducted. An in Environmental Social Impact Assessment is being undertaken. In progress To be determined by the feasibility study Ministry of Mines Open for Investment

ICT SECTOR

No. Project Title Project Summary Availability of Feasibility Study Estimated Investment (US$) Contracting Authority and/ or Promoter Project Requirements/ Financing Mode
1 Computer Assembly Plant The Zambia Information and Communication Technology Authority (ZICTA) is looking for a joint venture partner to set up a computer assembly plant to supply to schools in Zambia and the region with computers and tablets for education purposes.The project will be tendered within the first quarter of 2017. In progress To be determined by the feasibility study Zambia Information and Communication Technology Authority (ZICTA) PPP
2 Waste to Resource projects Zambia has high production of solid waste. This offers an opportunity for a lot of waste recycling projects to be established. For instance, a waste-to-energy project. To be determined by the feasibility study Ministry of Local Government Open for investment
3 Inland Dry Ports Development of Inland Dry Ports in strategic locations throughout the country such as Chipata, Kapiri Mposhi and Livingstone. This will provide logistical support to importers and exporters in Zambia. This will decongest borders. The feasibility study for the Chipata dry port has already been undertaken To be determined by the feasibility study Ministry of Transport and Communication Open for Investment
4 Border Trading Zones There are feasible opportunities for the establishment of Trading Zones in border areas such as the Kasumbalesa Border to take advantage of the high volumes of trade between the DR Congo and Zambia In progress To be determined by the feasibility study Ministry of Commerce Trade and Industry Open for Investment
5 Bulk Water Supply/ Irrigation Systems Project The project is for the establishment of huge water dams near the ten declared farm blocks across the country. This will run alongside the Farm Block Development Programme In progress Ministry of Water Development, Sanitation and Environ-mental Protection Ministry of Water Development, Sanitation and Environmental Protection Open for Investment